top of page
Writer's pictureWA BOS

WA BOS Builds CD Dodd Heavy Duty Triple for Scrap!


Early 2021 WA BOS delivered a custom built triple combination for transporting scrap materials from Karratha in the Pilbara to their Perth depot in Forrestfield for processing.

Through close communication with the team at CD Dodd we were able to deliver this combination on time and with design improvements to assist driver safety.


Axles and suspension "K-Hitch 10 Stud 13t rated axle, Disc brakes, 13t HD Airbag Suspension, WABCO Multi Volt EBS system.

Once again WA BOS appreciates the trust and support CD Dodd has given WA BOS over the years and we hope to continue working with the great team at CD Dodd.

Thank You!

Commentaires


bottom of page